网架结构安装-檩条安装

文章出处: 发表时间:2017-12-28【
第五章   檩条安装
Chapter 5  Purlin Installation 

檩条的安装应待网架的主体安装完成后进行。
The erection of purlin should be taken after acceptance of   completed structure erection.
1、首先对照施工图纸,按相应编号,把支托固定在网架上弦球上拧紧、调平。
To fixed bracket on the upper chord ball of space grid with tighter and leveling according relevant members of construction drawing.
2、把主檩条连接板用螺栓固定在主檩条上,主檩条按设计位置调准后通过连接板焊在支托上,要求主檩条折边的朝向要一致,焊接完成,拧紧连接螺栓。
The connection plate of main purlin should be fixed on the main purlin which welding on the bracket get by connection plate after adjustment of design position and require purline crimped toward to upper with welding and tightening connection plate
3、把次檩条连接板用螺栓固定在次檩条两端,然后按照设计编号用螺栓固定在对应的主檩条上。
Fasten the bolt on the both edges of the secondary purlin with the secondary purlin connection plates, fasten the bolt on the corresponding main purlin which is based on the design number.
4、全部檩条安装完成后,应平整、顺直、牢固,对焊接部位补刷油漆。
After the purlin installation completes, it should be level, straight, strong, brushing paint at the welding parts.

上一篇:已经没有了

此文关键字: 网架结构
友情链接:六合彩挂牌  六合彩特码资料  香港六合彩图  六合彩大全  香港六合彩公司  香港地下六合彩  香港六合彩管家婆  六合彩预测  六合彩官网  六合彩现场直播  六合开奖结果  六合彩报  六合彩开什么  六合彩开奖  六合彩全年资料  六合彩免费资料  六合彩图  香港六合彩图  六合彩脑筋急转弯  六合彩图片  六合彩天线宝宝  六合彩白小姐  六合开奖结果  六合彩官方网站  香港六合彩公司  六开彩开奖现场直播  六合彩大全  香港六合彩挂牌  六合彩玄机  六合彩开什么  香港六合彩直播  六合彩直播  今晚六合彩开什么  香港六合彩直播  香港地下六合彩  六合彩特码资料  六合彩图纸  今晚六合彩开什么  六合现场直播  六合彩玄机  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!