第一章   网架施工部署

Chapter 3 Construction Arrangement


一、技术准备
I. Technical preparation

1.工程开工前应组织各有关单位进行图纸会审,发现问题及时纠正,确保安装顺利。
1. Should organize the relative units to review the drawing before the construction, found and solve problems timely, ensure the erection smoothly
2.设计人员要向项目部及施工单位进行技术交底,重点要提出支座的固定要求,确保安装形式与设计假定一致。
2. The designer should make the technical clarification to project department, focus on coming up with the fixation requirements of support, make sure the erection type is comply with the assumption.
3.项目部技术人员与施工单位在开工前要对施工图、作业指导书等技术文件深入讨论,严格遵守施工工艺及作业要点。
3. Technician and the construction unit should hold a deep discussion about the construction drawing, operation instruction and other technical documents, be strict with the construction technology and operation points.
4.在安装过程中,施工单位要严格管理,按照设计图纸和技术规范进行安装,不得擅自改变任何技术参数。
4. During the erection, the construction unit should be strict with management, in accordance with the design drawings and technical specifications for installation, shall not alter any technical parameters.
5.进一步核算构件安装时各工况构件受力,确定抗失稳的技术措施、要求。
5. Further check components force under each condition during installing to determine the technical measures and requirements of anti instability.

二、材料准备

II:  Material preparation
1、根据施工图纸,编制主材、辅材材料计划,根据现场及加工进度安排,作好定货准备,确定进厂时间。
1. According to the construction drawings, material plan, prepare material, auxiliary materials and processing schedule according to the site, be ready for the purchase order, and determine the time into the factory.
2、根据施工方案,编制各施工工序所需材料、设备、机械,安全防护器材计划,确定进厂时间。
2. According to the construction plan, preparing the required materials, equipment, machinery, safety protection equipment plan, determine the time into the factory.
3、根据现场情况安装工期,编制构件进场计划、运输计划。
3. Prepare plan of components’ approaching and transportation to site according to the site installation period,
4、对现场周边交通状况进行调查,确定机械、设备及材料进场路线。
4. Investigate the traffic situation around the site; determine the route of machinery, equipment and material approach.

上一篇:已经没有了

此文关键字: 网架施工部署
友情链接:六合彩脑筋急转弯  香港六合彩官方网站  六合彩票  六合彩开奖  六合彩图片  香港六合彩管家婆  六合彩票  六合彩图纸  六合彩开码现场  六合彩走势图  六合彩查询  六合彩马报  香港马会六合彩  六合彩图纸  六合开奖结果  香港六合彩直播  六合开奖结果  六合彩曾道人  六合彩图片  六合彩票  香港六合彩结果  六合彩信息  六合彩曾道人  六合彩玄机  六合彩白小姐  六开彩开奖现场直播  六合彩大全  香港地下六合彩  六合彩官方网站  香港六合彩图库  香港马会六合彩  六合彩曾道人  今晚六合彩开什么  六合彩图库  香港六合彩图库  六合彩官网  六合彩图片  六合彩现场直播  六合彩综合资料  六合彩管家婆  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!